SAP Certified Specialist E_S4CON_2025 Practice Test Engine Try These 43 Exam Questions [Q25-Q44]

Share

SAP Certified Specialist E_S4CON_2025 Practice Test Engine: Try These 43 Exam Questions

Guaranteed Success in SAP Certified Specialist E_S4CON_2025 Exam Dumps

NEW QUESTION # 25
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?

  • A. Migration Server
  • B. Transition Server
  • C. Central Instance
  • D. Migration Hub

Answer: A


NEW QUESTION # 26
You are performing an SAP S/4HANA conversion with DMO. You entered a specific nummber of R3load processes during the Extraction Roaadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this questiion.

  • A. In SUM Analysis
  • B. In DMO Migration Preparattion
  • C. In SUM Parameters
  • D. In Process Control Center

Answer: C,D


NEW QUESTION # 27
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?

  • A. Shadow on target creation
  • B. Downtime conversion
  • C. Silent data migration (SDM)
  • D. Downtime migration

Answer: D


NEW QUESTION # 28
You are performing an inplace SAP S/4HANA conversion including DMO.
What is the latest point in time wheen you can reset the procedure without losing businness data?

  • A. The end of the database miigration
  • B. The start of the Execution roadmap step
  • C. The start of the business doowntime
  • D. The end of the business downtime

Answer: D


NEW QUESTION # 29
You want to perform an SAP S/4HANA conversion using SUM with inplace DMO.
Which steps run before the beginniing of the technical downtime, irrespective of your SUM configuration? Note: There are 3 coorrect answers to this question.

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Import of upgrade and langguage data from the download directory in phase TAABIM UPG
  • C. Activation of dictionary objects in phase ACT_UPG
  • D. Creation of application tablles in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATTE
  • E. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB

Answer: A,B,C


NEW QUESTION # 30
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP S/4HANA Server 2022
  • B. Standalone AS ABAP with SAP BASIS 752
  • C. SAP ECC system from SAP ERP 6.0 EHP 8
  • D. SAP Solution Manager 7.2

Answer: A,B


NEW QUESTION # 31
What is the main purpose of perforrming benchmark runs for an SAP S/4HANA conversiion?

  • A. To optimize the main import
  • B. To optimize the activation
  • C. To optimize the conversion
  • D. To optimize the migration

Answer: D


NEW QUESTION # 32
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.

  • A. You can find the optimal nuumber of parallel R3load processes by monitoring hoost performance.
  • B. You can record the modification adjustment during migration and use the transports in the next runs.
  • C. You can verify that the conttent of the download directory matches the stackXMML file.
  • D. You can obtain migration duration files from a previous benchmark run that caan be used to optimize the next runs.

Answer: A,D


NEW QUESTION # 33
You are running an SAP ECC system .
For which of the following activitiess does SUM allow you to use the near-Zero Downtimme Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Use DMO for SUM.
  • B. Perform an SAP S/4HANA conversion without DMO.
  • C. Perform an SAP S/4HANA conversion including DMO.
  • D. Upgrade the SAP system.
  • E. Apply SAP Support Packagees.

Answer: A,D,E


NEW QUESTION # 34
You performed a custom code checck for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.

  • A. SYCM (Simplification Database Content)
  • B. SE80 (Object Navigator)
  • C. SAT(Runtime Analysis)
  • D. ATC (ABAP Test Cockpit)

Answer: B,D


NEW QUESTION # 35
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functtions are switched on. Following SAP recommendatiions, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. Import a transport request from the development system that contains the reccording of the activation.
  • B. Activate the required business functions manually in the production system.
  • C. During conversion, SUM deelivers some business functions already activated.
  • D. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.

Answer: A,C


NEW QUESTION # 36
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for thee last time?

  • A. Before the downtime startss
  • B. As part of the cleanup process
  • C. Early in the downtime
  • D. At the end of the downtimee

Answer: A


NEW QUESTION # 37
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shaddow instance? Note: There are 2 correct answers to this question.

  • A. Modification adjustment (SPAU)
  • B. Modification adjustment (SPDD)
  • C. Activation of dictionary objects (ACT_UPG)
  • D. Conversion of application tables (PARCONV_UPG)

Answer: B,C


NEW QUESTION # 38
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For soome software components, you find entries in the Calculated level column.
What does the Calculated level indiicate for those software components?

  • A. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
  • B. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner
  • C. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
  • D. The SAP Support Packages that will be bound to the conversion

Answer: C


NEW QUESTION # 39
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks muust be performed during the preparation phase?

  • A. Check the compatibility of custom code with SAP S/4HANA.
  • B. Solve problems from the si mplification item (SI) checks.
  • C. Run the database migrationn to the SAP HANA database.
  • D. Perform the migration of data to the new data structure.

Answer: A


NEW QUESTION # 40
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Whicch phases are executed during SUM technical dowwntime? Note: There are 2 correct answers to this question.

  • A. PARDIST_SHD
  • B. PARMVNT_UPG
  • C. TABIM UPG
  • D. TABIM_SHADOW_INC

Answer: B,C


NEW QUESTION # 41
......

Test Engine to Practice E_S4CON_2025 Test Questions: https://actualtests.latestcram.com/E_S4CON_2025-exam-cram-questions.html