Regular customers get the first look at savings: LatestCram sends official holiday coupons to existing C-TSCM42-64 customers before anyone else, and companies building long-term relationships can discuss SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 discount arrangements directly.
SAP C-TSCM42-64 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Product Cost Planning | 10% | - Cost Estimate with Quantity Structure - Integration with PP - Cost Rollup & Analysis |
| Topic 2: Capacity Planning | 15% | - Work Center Capacity Configuration - Capacity Evaluation & Load Analysis - Capacity Leveling |
| Topic 3: Production Orders | 25% | - Material Staging & Goods Movements - Order Confirmation & Settlement - Availability Check & Scheduling - Order Status Management - Order Creation & Release |
| Topic 4: Repetitive Manufacturing & Kanban | 10% | - Kanban Process & Control Cycles - REM Confirmation & Backflushing - REM Master Data & Run Schedule Quantities |
| Topic 5: Master Data | 20% | - Bill of Materials (BOM) - Production Versions - Material Master - Routings and Task Lists - Work Centers - Engineering Change Management |
| Topic 6: Demand Management & MRP | 20% | - MRP Evaluation & Exception Messages - MRP Procedures & Planning Strategies - Demand Management & Planned Independent Requirements - Net Requirements Calculation & Lot Sizing |
Preparing for C-TSCM42-64 with LatestCram: What to Know
- Demand Management & MRP (20%)
- Capacity Planning (15%)
- Repetitive Manufacturing & Kanban (10%)
SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 Sample Questions:
An enterprise based in the USA produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit kilogram (KG).
Which of the following solutions does SAP ECC offer?
- A. There is no need to take any action. There is a general conversion in the central customizing of units of measurements, so that automatic conversion of pounds to kilograms takes place.
- B. In the material master, you create a conversion factor for converting pounds to kilograms on basic data view 1.
- C. In the basic data customizing, you create a unit of measure group that converts pounds to kilograms. You then assign this to the material master on basic data view 1.
- D. You create a new material with a reference to the original material and assign the metric unit of measure to the new material master.
Correct Answer: A 🗳️
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.)
- A. Reorder point planned materials can be included in long-term planning.
- B. In case of external procurement, long-term planning creates purchase requisitions.
- C. A planning scenario must be released to use it in long-term planning.
- D. Long-term planning generally is operational planning of important components.
Correct Answer: A,C 🗳️
Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)
- A. The order is no longer relevant for Material Requirements Planning.
- B. Capacity requirements are deleted.
- C. Purchase orders for external operations or non-stock materials are deleted.
- D. Reservations are deleted.
- E. The order and its operations receive the system status Locked (LKD).
Correct Answer: A,B,D 🗳️
What options for selecting a routing exist when creating a production order?
(Choose three.)
- A. Selection on the basis of the production control profile
- B. Manual selection
- C. Selection on the basis of the routing number in the material master for the material to be produced
- D. Automatic selection, controlled via settings in Customizing
Correct Answer: A,B,D 🗳️
In the SAP ECC system, a material is produced with the help of production orders. Though originally used for rate-based planning only, the planning table is to be used to plan this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material.
Which one of the following reasons for this message applies?
- A. There are no requirements present.
- B. The series production indicator has not been set.
- C. There are no planned orders or production orders present.
- D. There is no valid production version for this material.
Correct Answer: D 🗳️